LL

Lin Li

Electrical Engineer at AESO

Lin Li is an experienced engineer with a strong background in electrical engineering, currently serving as an Engineer at Customer Access Studies with AESO since July 2021. Prior experience includes roles as an Engineer in Training at Power Grid Specialists Corp., where over 40 interconnection projects in Alberta's transmission system were completed, and as a Junior Electrical Engineer at JPAK Engineering & Consulting Inc., focusing on design work for a sweet gas plant. Lin Li holds a Master of Engineering in Electrical Engineering from the University of Alberta and a Bachelor of Applied Science in Electrical Engineering from North China Electric Power University. Previous internships and projects also include extensive work with high voltage equipment and power distribution systems.

Location

Edmonton, Canada

Links


Org chart


Teams

This person is not in any teams


Offices


AESO

1 followers

The Alberta Electric System Operator (AESO) manages and operates the provincial power grid. We're a not-for-profit organization serving in the public interest. We work with industry partners and the government to make sure reliable power is there when you need it. Whatever changes happen in the world, Albertans can rely on us to manage the electricity markets and meet your energy needs. From integrating renewable energy into your life to developing the grid, the future for electricity in Alberta looks bright. What do we do Manage and plan the power grid 24 hours a day When you need power, you expect it. We work with industry partners to keep electricity flowing throughout the province. Our system controllers balance supply and demand 24/7, making sure four million Albertans have power when they need it. Manage and operate the energy markets In Alberta, companies own generation, transmission and distribution facilities. We dispatch the power sold by generators, using the lowest-priced electricity first and then the next lowest until the need for power has been satisfied. We also enforce transmission tariffs and regulations, keeping the market fair and open for everyone. Plan the future of the system and its infrastructure As Alberta grows, so does its need for electricity. We plan ahead and expand the grid, ensuring the right transmission lines are built as efficiently as possible. As the province moves away from coal-fired power plants, we're enabling investment in renewable energy. In everything we do, our eye is always on the future.


Headquarters

Calgary, Canada

Employees

201-500

Links