Ingérop
Maxime Van de Velde is a Project Manager at Ingérop since March 2017, primarily involved in the Grand Paris Express, overseeing the design of Massy-Opéra and Antonypole stations for Line 18. Previously, Maxime contributed as a Graduate Structural Engineer focused on the design and analysis of below-ground reinforced concrete elements for the same metro line. Additionally, experience includes serving as a Structural Engineer on the HS2 project, where detailed design work for shafts was performed. Earlier in 2016, Maxime worked as a Site Supervisor at Eiffage Construction, managing operations for the Robert Doisneau High School project in Corbeil Essonnes. Maxime holds a degree from ESTP - Grande école d'ingénieurs de la construction, completed in 2017, following a Classe Préparatoire PT at Lycée Eugène Livet from 2012 to 2014.
This person is not in the org chart
This person is not in any offices
Ingérop
1 followers
Basé à Rueil-Malmaison, Ingérop est un groupe d’ingénierie et de conseil, œuvrant sur des enjeux majeurs pour bâtir, dès à présent, le monde de demain : mobilité durable, transition énergétique, cadre de vie. Doté des certifications ISO 9001, ISO 14001, ISO 45001 et ISO 19443, le groupe a acquis une solide notoriété dans l’ensemble des métiers de la construction : bâtiment, eau, énergie, industrie, infrastructure & mobilité, transport, ville. Ses équipes aguerries proposent un accompagnement technique pointu, couvrant toutes les phases des projets et des chantiers. Acteur de référence en France, Ingérop dispose d’une forte présence à l’international, en constante progression. Le groupe poursuit en effet son développement régulier, en s’appuyant sur son indépendance actionnariale, son expertise technique, sa capacité d’innovation et sa proximité avec ses clients.