KORE Power
Brandon Gorrill has significant experience in engineering and technology, currently serving as the VP of Engineering - Batteries at KORE Power since November 2019. In this role, Brandon has contributed to the development of high-density and high-voltage energy storage solutions, including the 1500V Mark 1 Energy Storage System. Prior to joining KORE Power, Brandon worked at Intermax Networks from July 2015 to November 2019, where positions included Systems Engineer and IT Support Specialist.
KORE Power
3 followers
Kore Power manufactures energy storage, electric vehicles, microgrids, utilities and e-mobility systems for the clean energy industries.