NS

Nausa Nugraha Suryaputra

PM For Railway System Div. Head at PT. MRT Jakarta

Nausa Nugraha SuryaPutra has diverse work experience in various industries. Nausa Nugraha currently holds the position of Rolling Stock Department Head at PT. MRT Jakarta since June 2023. Prior to this, they served as the Act. Power System Department Head at the same company from March 2018. Nausa Nugraha has also worked as a Power System Engineer at PT. MRT Jakarta from July 2015 to February 2018.

Before joining PT. MRT Jakarta, Nausa worked as a Mechanical Engineer at PT. Mega Eltra from April 2011 to June 2015. During their time there, they were involved in various projects, including the uprating of transmission lines and the construction of a gas-HSD fired power plant. Nausa Nugraha had responsibilities such as site engineering, QC officer, and managing subcontractors/vendors.

Nausa Nugraha started their career as a Quality Control personnel at Honda Prospect Motor from May 2010 to April 2011. Prior to that, they worked as a Processing Supervisor and Maintenance Supervisor at PT. Musim Mas from October 2008 to January 2010.

Overall, Nausa Nugraha SuryaPutra has gained substantial experience in power systems, engineering, project management, and quality control throughout their career.

Nausa Nugraha SuryaPutra completed their Bachelor's degree in Mechanical Engineering from the University of Indonesia. Nausa Nugraha attended the university from 2002 to 2008. In addition to their degree, they have obtained several certifications throughout their career. These certifications include PRINCE2® Foundation Certification Training from AXELOS Global Best Practice, obtained in June 2021, Sertifikat Pengadaan Barang dan Jasa Pemerintah from Lembaga Kebijakan Pengadaan Barang/Jasa Pemerintah, obtained in April 2021, Lean Six Sigma Green Belt Certification from Unotalent Indonesia, obtained in February 2019, and Sertifikat Kompetensi Tenaga Teknik Ketenagalistrikan (SKTTK) - Analis Utama from Direktorat Jendral Ketenagalistrikan ESDM, obtained in December 2019.

Location

Duren Sawit, Indonesia

Links


Org chart


Teams

This person is not in any teams


Offices

This person is not in any offices


PT. MRT Jakarta

1 followers

PT Mass Rapid Transit Jakarta (PT MRT Jakarta) was established on June 17, 2008 as Limited Liability Company with a majority of shares owned by the Provincial Government of DKI Jakarta as much as 99.98% and the rest is owned by PD Pasar Jaya as much as 0.02%. The scope of work of PT MRT Jakarta including the construction of MRT infrastructure and facilities, to operate and maintain infrastructure and facilities, as well as develop and manage property / business in Depo Lebak Bulus, stations and surrounding areas. MRT Jakarta development plan has actually been initiated since 1985. But only in 2005, the project was acknowledged as national project by President of the Republic of Indonesia. Phase 1 MRT Jakarta project was fully financed by Japan Bank for International Cooperation (JBIC) which is merged with Japan International Cooperation Agency (JICA) later on. JICA acts as an assessment team and JBIC as a lender. The project design was started in 2008-2009, and the construction phase was started in October 2013 with the target of finishing at the end of 2018. MRT Jakarta Phase 1 will operate in March 2019, with the route approximately 16 kilometers from Lebak Bulus, South Jakarta to Bundaran Hotel Indonesia, Central Jakarta. At Phase 1, it will be consisting of 7 elevated stations: Lebak Bulus, Fatmawati, Cipete Raya, Haji Nawi, Blok A, Blok M, Sisingamangaraja and 6 underground stations: Senayan, Istora, Bendungan Hilir, Setiabudi, Dukuh Atas, Bundaran Hotel Indonesia. With target of > 200,000 passengers in a day and flexibility to manage Transit Oriented Development (TOD) around the station area, MRT Jakarta optimists to be one of the leading rail-based transportation companies in Indonesia for safety, reliability, customer service and time efficiency.


Employees

501-1,000

Links