Tennessee Valley Authority
Leslie Warnock, P.E. is a Principal Engineer specializing in Transmission Line Design at the Tennessee Valley Authority since September 2012, where responsibilities include planning and coordinating transmission line routing with complex design and environmental considerations. Previous roles at TVA involved structural engineering for transmission lines utilizing specialized design software. As President of SORBA Chattanooga from February 2020 to January 2023, Leslie doubled the organization's membership and managed events focused on mountain biking. Academic qualifications include a Master of Science in Structural Engineering and a Bachelor of Science in Civil Engineering, both from Auburn University, complemented by research experience addressing structural challenges in bridge design and load rating analysis for the Alabama Department of Transportation.
This person is not in any teams
This person is not in any offices
Tennessee Valley Authority
13 followers
Tennessee Valley Authority (TVA) operates a public power system and supplies power in Tennessee, northern Alabama, northeastern Mississippi, and southwestern Kentucky and in portions of northern Georgia, western North Carolina, and southwestern Virginia. The Company manages the Tennessee River, its tributaries and certain shorelines to provide navigation, flood damage reduction and electricity, among others. The Company is a wholesaler of power. The Company sells power to local power company customers of TVA (LPCs), which then resell power to their customers at retail rates. TVA's LPCs consist of municipalities and other local government entities (municipalities), and customer-owned entities (cooperatives). TVA has approximately three nuclear sites consisting of over six units in operation and approximately one unit under construction. The Company's transmission system has approximately 70 interconnections with over 10 neighboring electric systems.